I have a 100/20 smart controller. I want to install 2 100w panels on the roof. I have 400ah of lithium...I know it's not enough but it's a start. My panel specs are
open circuit voltage 24.3v
Optimum voltage 20.3v
optimum current 4.93a
short circuit current 5.34a
max voltage 600vdc
The cabling is 10awg to a isolating 16a breaker then to the controller.
Which is the better way to connect?...in series or parallel? I'll likely add panels later.
Thanks