Hi, I am having toughts of running 2 x Multiplus in paralell with a single phase system, and maybe expanding up to a total of 4 later on. Using 1 source of single phase AC (230V) from grid.
I have a couple of questions:
- When running ESS, can both Multipluses feed back into the grid (doubling the normal feedback contra using only 1)?
- The transfer switch when grid is on, will that be "duplicated"? When I use 1 multiplus, the transfer switch is 32A when grid is connected. When I use 2 in paralell, will I get the same as 2 x 32A transfer switches? Or is there something im missing?
- My phase coming into my house is fused with 63A, therefore I would like to use as much as possible from that before supplying from battery (powerassist). So using 2 x 32A fuses (1 for each multiplus) should in theory give me 7360W pr multiplus of grid use, and 2400W of non-grid use? Or did I misunderstand the concept of transfer switch?
Thanks in advance :)