Hi community,
I allow me to repeat this question already partially existing in 2 older posts but without satisfactory feedback from my point of view.
As user and automation engineer I see many advantage having 2 small units 5kVA instead of 1 big 10kVA (talking about Multiplus-II) for redundancy, wiring gauge, and more
But I'm unable to estimate if this would be considered as a disadvantage by those used to install Victron material, like those non exhaustive questions for instance:
- would the parameterization be more complex, much more complex, ....?
- would the basic consumption be much higher?
- would the 2 units run in synch in case an existing CerboGX is switched off
- would the installation continues working without action if one of the 2 multiplus were off for any reason (the master or the slave)
Thank you in advance for sharing your experience about this subject