Hello Community
I have search all the Q&A here however cannot find the answer.
New install 3 x Quattro 8kVA, EM24 Ethernet energy meter, Cerbo GX.
I completely rebuilt the main DB from the supplier (Utility) pole. The phasing has been religiously followed from the Utility right upto the quattros.
I cannot get the system (EM24) / (Cerbo) / (Quattros) to start up. A phase sequence error continues to be reported.
How is this possible?
Why can't I set the EM24 to report the correct sequence. Or the sequence that we want. This is a large existing facility.
Why can't I (How can I) set the Quattros to accepted my sites phase sequencing.
What, How can I fix this? Surely the existing site sequence can be maintained- IF this is the reason?
Much appreciated