Having just installed a Lynx Smart BMS and Smart Lithium batteries (great products by the way) I thought it would be advantageous to have a testing mode that allows the installer to independenty simulate various conditions (over voltage, under voltage, low temperature) to ensure that the DVCC, ATC, and ATD are controlling connected devices in the intended manner. While I have seen a manual, custom built, switch-box that has been built to interface with the battery management connections it would be great to do this in software using VictronConnect. This sort of testing is more thorough than the all or nothing approach of turning the device off using the remote which shuts down everything simultaneaously.