Hi,
i plan to install this ESS-System:
2 Quattros in parallel to increase power
1 SmartSolar MPPT
1 Generator
1 Batterypack
I have 2 AC shorepower grid connections 4,5 KW and 3 KW for 2 separate appartements.
Now my question:
To avoid overload the grid connections can i set their limits separatly, maybe to connect 1. AC (4,5 KW) to the AC input 2 of the Quattro (Master) and the 2. AC (3 KW) to the AC input 2 of the Quattro (Slave)? I plan to connect the generator to both AC inputs 1 of the 2 Quattros in parallel.
I read this documentation but i not found an answear:
https://www.victronenergy.com/live/ve.bus:manual_parallel_and_three_phase_systems
TIA