Hi everyone, We are working on an off-grid system with backup desiel generator and battery bank to feed a communication tower with 48.4kW load for 24 hours a day. In the based design I'm using (3-phase Quattro 48/15000 (6 units) + BYD B-Box 51.2V LVS 24kWh (5 units) for backup + Longi Bifacial panels 530Wp (160 modules) + MPPT Charge Controller 250/100 (15 units)).
1-will this 84.4kwp of solar PV panels provide required power for the system?
2- Can I use SmartSolar MPPT RS 450|200 (9 units) instead of MPPT Charge controller 250/100 (15 units)? it is sufficient?