Hi, I have a multi-+2 3000 W charger/ inverter connected to 1450 amp hours of battery storage at 12v, I'm trying to figure out how to configure the multi plus so that I can use the stored energy in the battery to supplement the the generator to reduce fuel consumption for a longer period of use time. I tried this using power assist settings in reducing the incoming amperage from the generator so the converter would supplement power, that worked great until the loads dropped below the set point of power assist in the battery speaking to charge off of the inverter.
Does anyone have a suggestion on how this can be configured properly so I can use/consume the energy stored in the battery and supplement the generator for a longer period of runtime and fuel savings? Ideally I would still like the ability to use the MPPT
to charge the batteries while in this configuration. Also I am always not on generator and need to be able to switch back to normal operation when connected to the gird/shore power. I tried to use the ESS assistant but is not recommended and did not work well with the generators.