We have a large bank of Pylontech batteries, Discharge current limit is 370A. In screenshots below show the charge current, as well as input power from a scheduled charge. Notice that all three machines are drawing their maximum but not charging the batteries with all the available power. Loads at that time are also low. Any Suggestions?