Hi All,
I'm currently having a go at building my own off-grid 3 Phase system, I want to keep the option of grid use for random heavy 3 phase use (e.g. welder) but don't want to feedback to grid.
I'm not sure on the best configuration of panels, mppts (size), and if I need a BMS.
Would love some expert help.
