If I'm planning to install a Quattro 48/8000 and use a Fronius inverter (3.6kw) will I need to use G99 or G98 cert? I assume that the Quattro and the fronius will be connected in parallel to the grid so does that mean that the highest rating (Quattro) would need to be approved even if I'm not feeding back to the Grid? Under the G98 reg for the Fronius @ 3.6Kw its just a notification but the Quattro if considered connected woud need a G99 Type A as its rated at 6.5Kw?
Any ideas on how to have this setup under G98?