Multiplus II 48/3000/35, Cerbo GX, Pylontech U2000 by 3 (ESS installed) How do I set up a load to use battery only based on peak cost 4pm-7pm? The battery is scheduled to charge at 2am-5am (low cost). Ideally keeping 15% SOC for protection. Note. NO energy meter is installed.