On my attached schematic what port in the BP100 should the load stop from the CL 12/100 go to?
Same question re the BMV, what port from NO to the BP65?
Lastly does it matter which cables go into/out from the inverter switch on this schematic.
This site is now in read-only archive mode. Please move all discussion, and create a new account at the new Victron Community site.
On my attached schematic what port in the BP100 should the load stop from the CL 12/100 go to?
Same question re the BMV, what port from NO to the BP65?
Lastly does it matter which cables go into/out from the inverter switch on this schematic.
Should be in the instructions:
https://www.victronenergy.de/upload/documents/Manual-BatteryProtect-48V-100-A-EN-NL-FR-SV-DE-PT-ES-IT-TR.pdf