Installing two Quattro 5000 120 volt in split phase 240 volt off grid and want to wire a 240 volt generator to both Quattros 120 volts each and use both battery chargers to double my charge rate is this possible?
This site is now in read-only archive mode. Please move all discussion, and create a new account at the new Victron Community site.
Installing two Quattro 5000 120 volt in split phase 240 volt off grid and want to wire a 240 volt generator to both Quattros 120 volts each and use both battery chargers to double my charge rate is this possible?
Assuming the generator is 120/240VAC split phase, yes.