Hello , experts!
There is a task to design a system in which there will be a Gas Generator, Grid and ESS. The house has a rated load power of 138 kW. The electricity supplier (GRID) can provide no more than 80 kW. The remaining 58 kW will be added (upon load request) by the Gas Generator. They will work synchronously. The task is to install ESS between the load and Grid+Gen. The composition will include Quattro 15000 - 12 pcs. , Fronius Eco 27 - 1 pc. , Symo 15 - 2 pcs. , Cerbo GX, GX-Touch, Battery (LiFePO4) 100Ah48V - 22 pcs. The ESS in this system should support the load during Generator warm-up, Daytime PV compensation, Start and stop Generators on event (overload power exceeding 80kW), Shutdown non-priority load in case of SOC<50%, Transmit data via MODBUS about the load on each phase, SOC.. on the Industrial controller. During the winter, the generators will operate around the clock. Heating will be provided by them. Do you think it is possible to implement such a system with Victron? What do I need to pay attention to? If I gave little information - I will answer. Any advice! Thank you!