I just picked up a new 2022 Fuzion 419 toy hauler with the 400w solar system and Victron 100/30 Bluetooth controller installed.
Keystone seems to have ran the charge wires from the Victron MPPT to the house converter instead of directly to the battery.
I am installing a second set of 400w (total) panels on the roof with an additional Victron 100/30 Bluetooth controller along with an upgrade from one lead acid battery to two SOK 100ah lithium batteries.
My question is: should I hook the charge wires directly to the battery or run them to the house converter like the original MPPT controller is hooked up?
I assume that the new controller will show up in my device list on my phone like the original MPPT controller and smart shunt does now.
Other than switching battery charging parameters in both MPPT controllers to match the new SOK lithium batteries is there anything else I should do?
Do the MPPT controllers need any other sort of communications added to work together?
One other note. Keystone did not provide a way of disconnecting the solar panels from the MPPT controller so I am planning on also adding a set of 30a two pole breakers for each set of solar panels and their controllers. I assume that is a good idea?
Should there also be a switch or breaker between the controller and battery?