question

keegs avatar image
keegs asked

Like to run air conditioner off my batteries as well as shore power and generator.

a2ef6c70-4952-4851-a339-68ddae175639.jpeg99d0cc8a-2211-45e0-9505-836f9cfa55f0.jpegImage Caption

6b67059a-2b83-4c15-a725-e4d0604a6058.jpeg
setup
1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

klim8skeptic avatar image klim8skeptic ♦ commented ·
3 comments to make.


You have not provided any details of your system.

The photo of your distribution board shows major flaws.

Who built this disaster?


Contact the electrical safety board in your state and report this.

0 Likes 0 ·
1 Answer
Paul B avatar image
Paul B answered ·

just move the ac2 connections from AC2 out and add them to the ac1 out connections, this means everything will then go through the inverter inverting side - if the inverter is NOT big enough it will overload and thus turn off. so you will have to limit what you turn on yourself -

Yes the main control panel does not look correct so you should get this sorted out as well.




2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Related Resources

Additional resources still need to be added for this topic