Multiplus-II 48/5000/70 Error 10 and Error 8

when i switch on my 3 phase system, the Multiplus-II needs several minutes to start (3 x Multiplus-II 48/5000 and a Cerbos GX) Most of the time i will get several:

VE.Bus Error: VE.Bus Error 10: System time synchronisation problem occurred

today i got a new one and the Multiplus-II stopped:

VE.Bus Error: VE.Bus Error 8: Ground relay test failed</pre>

There is no load connected to the Multiplus and they are all connected to earth via the input connector as well as by the chassis ground screw. It is an ESS 3 Phase system with a Fronius Symo 8.2-3-M.

One of the Multiplus has been installed end of November, the additional 2 ones in January.

	
Product MultiPlus-II 48/5000/70-48	
Firmware version 490	
Last connection a minute ago	
Product id 2623	
VE.Bus connection VE.Bus	
Hardware configuration three phase system, one unit per phase
Multiplus-II3 phase
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
enersol avatar image
enersol answered ·

I have the simmillar problem. 3 phase ESS system resets itself while beeing controlled by Cerbo GX.