Hello All,
I am currently building out my Victron Power Distribution System. We have a LYNX BMS, WS500, 2 Victron Smart 200AH batteries, Shore Power 30 AMP input, Multiplus 3000 12v, Cerbo control, and a MPPT blue.I am wondering what the dipswitches on the Multiplus 3000 12v need to be. Will the Cerbo override the internal dipswitches? Can the firmware for this devices be loaded with a connection to the cerbo only or will each device need to be connected to update firmwares.