Been running a ESS system for some years, Multi Plus 2 and LG Chem RESU 6.5, it's all been working fine.
To add more capacity i have added a RESU 10 via a RESU Plus (bonding the two batteries togeather).
I have changed the capacity in VE Configure = to 315 Ah (sum of the two batteries). Changed the relevant DIP switches on the batteries.
Also running colour GX, the battery is recognised, and last night scheduled charge worked as expected. However the inverter will not invert. Grid power = AC load and battery is not discharged.
I have reconfigured the battery DIPs, connected directly to the inverter (not via RESU PLUS) and system works as expected with each battery in turn.
I have asked LG Chem for the latest BMS firmware, but in the mean time any ideas?