dear brains trust,
I have two MPPT controllers connected to my VE.CAN bus along with a Cerbo GX and Lynx Shunt. My batteries are AGM and unmanaged. I also have a Multiplus II interfacing with the CerboGX. My understanding is that when the Multiplus is inverting/charging it takes control of the charge algorithm as indicated by ‘External Control’ display on the MPPT controllers. This continues even when the Multiplus II has been turned off for several days. I have tried to configure Bluetooth VE.Smart to no avail. So what I want to know is when the Multipluss II is out of town who is wearing the pants (and where do I change the maximum absorption time - as the devices do not revert to float mode - I have also changed the maximum absorption time settings in both MPPT controller with no impact. Devices are configured for Victron AGM batteries with a maximum 6 hour absorption and adaptive charging). I have an 1180 AGM 12 v bank and after a day of absorption battery charge is minimal yet no float. All software is up to date including Venus 8.89.36.
kind regards
Sarah