Hi there,
I am asking this question because the instructions for MPPT 250/100 and VE Bus BMS are a bit vague.
The system configuration I have is the similar to that at the bottom of page 8, English section VE Bus BMS manual.
The difference between this and my system is I have 2 parallel Pheonix Invertors and 2 MPPT 250/100 chargers.
The question is how do I connect the MPPTs into the charge shutdown as they
a. only have VE Direct port
b. I only have one VE Direct port left on the CCGX after the BMS712 is connected.
Is the "yellow" cable shown going between the VE Bus BMS charge shutdown terminal to the MPPT enable terminals a special cable?
Batteries at this time is 2 parallel 4 x 12 series 90aH in battery tower, ie 180 aH @ 48V
Thanks in advance for your help,
Cheers,
Dave