Hello,
i m currently setting up a system for a liveaboard vessel - meaning mostly connected to (expensive) shore power, 24/7 consumption on both, 230v AC and 24DC systems.
There is space and will for a PV-system with about 1kw peak.
I'd prefer to install a BlueSmart IP22 charger for Shore Power and a SmartSolar MPPT fitting to the PV-panels.
English (latest?) version of the VE.Smart Network Manual tells the two chargers will "synchronise charging process" - with no further explanation how.
Is there priority for the MPPT to deliver the max. available power (if needed) while the AC charger is "second priority"?
Would be happy about some further details on this!
thanks a lot,
R. Lamersdorf