Hi team. I recently installed a by 20kva(10kva*2) parallelled quatrro coupled with 2* 20/16 LiFePO4 Freedomwon batteries, 2*150/100 Smartsolar MPPT sitting on 9.75kWp solar. I am convinced i followed all the necessary steps to configure a single phase parallel system. The ACin 1 comes of a changeover switch of utility power and a 3 phase genset.
Problem 1:is now and then it shows negative ac indicating grid feeback which i have not allowed on my ccgx settings. What could be the reason
Problem 2: when the changeover switch is rocked to the genset side, the inverter system takes more than is usually normal to connect to the acIn. When it does connect it makes a repeated humming sound 4 times before disconnecting /rejecting the gen input. It waits for a couple of second and tries reconnecting only to repeat the same sequence again. What could be the case with the gen set ac input?