question

cbrboot avatar image
cbrboot asked

Automation quattro's

Hi,

I have a 3 phase quattro system up and running and i would like to automate/script the following but was wondering if this was even possible:
In ESS
- Change the mode at any time from "optimized" to "keep batteries charged"
- Change Minimum SOC %
- Max charge power
- Grid setpoint
- Enable / Disable a schedule
- Change / setup a schedule

If so, how?
I did check the excel for the modbus options but not all of the option could be set so i was wondering if there was another way to maybe get this done?

MultiPlus Quattro Inverter Charger
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

0 Answers