I soon gonna install a pack of lifepo4 cells 24v 560ah and I got the victron mppt smart 250/60 mc4 that will charge it from solar. Then I have the skylla i 24/80 that I can charge the bank with from the diesel gen. I wonder how I must sett the skylla i and if the rec bms can control the skylla i to stop charging when the pack is full?! I know that I can configure the skylla i to lifepo4 but is it possible that the rec bms will controll the skylla i from the cerbo gx?! (The People at rec bms say so) And the last question is: the rec bms will controll a high/low volt disconnect but will the mppt take damage if the batterybank is disconnected from the mppt while it is taking in current from the solar array?
I Hope You understand what I mean