I am thinking of purchasing RS 450/100 controller which would be 60 meters away from an array of x16 - 330W Jinko panels. I already have a pos & neg 6mm2 cable in place over this distance. As the RS has two mppt trackers my proposal is to split the array into 2 x 8 panels to keep the VOC below 432V as per spec... the victron string calculator says this is fine and I could go up to 2 x 9 panels if I can find a couple more similar. Calculation Here
So, my question is to save on buying another 120 meters of cable can I Y parallel the two arrays in to the existing 6mm pos & neg cable and then just before the RS controller Y them back again to two separate arrays to feed in to the RS? Will this cause a fault or damage the controller?
Any help much appreciated
TIA
Here is pic of my proposal