I have space for 7 x 40Voc 355W panels on my roof going into an Easysolar 5000 and 2 x Pylontech 48/3000 batteries
I can envisage only 6 panels connecting to the 150/100 MPPT at 80v or 120v configuration
If I want the 7th panelincluded, am I right in thinking that it would be best to reconfigure and buy a second Victron MPPT controller and configure 3 panels in series at 120v into the 150/100 MPPT and four in 2p2s configuration at 80v into a second MPPT controller link the two MPPT outputs into the batteries and both their controls into the GX controller?
Thank you in advance for any expertise offered on the above proposal and secondly the system design I am considering in general.
Kind regards