I have a multiplus GX and pylontech batteries, brand new. The MPPT is connected to the GX inverter, setup on DVCC, and the BMS from pylontech controls the MPPT (Smart one, 150/35) which says "external control" All good.
I have added a 2nd string with another smart MPPT (100/20). I created a smart network for the MPPTs and synchronized them. All good.
Then the error 67 appears. Lost BMS. How do I control the second MPPT with the BMS? Is there a VE direct daisy cable available? Do both MPPT have to be VE direct hard wired and how?