Three phase Quattro 10K 208V/120V system does not use the full capabilities of a 100KW three phase generator.
We have SIX (6) Quattro configured with 9 SmartSolar MPPT and a large 1400Ah battery with REC-BMS. The system is configured to use Gird in AC-IN-2 and Generator in AC-IN-1. We also have ESS configured.
In the VE Configure 3 software the AC1 and AC2 inputs are configured to its maximum of 100A. Each Quattro has a 100A breaker going into a 3 phase load center, and the Generator feeds this load center with up to 277A per phase.
Having 2 Quattros per phase should allow me to feed in from the generator 95A per Quattro. But the system is doing a max of 100A total, I thought that the VE Configure 3 tool was configuring each individual Quattro and not the whole system.
How can I get my system to use the most out of the generator?
-Carlo