Currently running our static lodge off of solar with 4 pylon tech batteries and the multiplus 2, no grid connection. I want to run power my workshop as well as we have plenty of spare capacity. Obviously ac out 2 is only functional under certain conditions, would it be ok to run another 6mm swa from ac out 1 to the consumer unit in the workshop?? Is there another way to do it that would be better/safer/easier
Any help appreciated
fraser